Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • 3G at Deutsche Telekom, switch off at the end of June 2021

  • 3G at Vodafone in DeutschlandGermany, switch off at the end of June 2021

  • 2G at T-Mobile in Netherlands, switch off at the end of June 2021

  • 3G in Norway (Telia), switch off at the end December 2025

  • 2G in Switzerland (Swisscom), switch off at the end December 2020

In Germany, Deutsche Telekom, Telefonica already have LTE-M.

  • Neocortec (Germany): already have SubGHz Meshnet.

Note:

  • Soon, pure GSM devices will no longer function in various European networks operator.

...